Customization: | Available |
---|---|
Interface Type: | PCBA |
Operating Frequency: | High Frequency |
Still deciding? Get samples of US$ 0.2/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Production Cycles | 7~15 Days Per Order | Years of Experience | More Than 20 Years, Founded in 1999 |
R&D Capacity | Yes, Professional Engineer Team | Testing | Horizontal&Vertical Flame Test, Salt Spray Test |
RoHS Complaint | Yes, The Report Can Be Offered Per Shipment. | Reach Compliant | Yes, The Report Can Be Offered Per Shipment. |
Mould Manufacturer | Ourselves | Mould Leadtime | Within 20 Working Days. |
Total Employee | 200+ | Injection Machines | 30+ |
Stamping Machine Qty. | 24+ | Factory Location | Shenzhen, China |
Other Services | Auto Assembly | Transport Package | Anti-Static Tray |
Specification | Customized | Trademark | FPIC |
Forman has specialized in the fabrication industry since found in 1999, and we offer one-stop whole services from mold fabrication, plastic injection, metal stamping, assembly&package, surface treatment, and shipment. Our products are popularly used for electronics, automobiles, medical, transportation and so on.
Our Capacity | Full-Auto Production Line for plastic injection, metal stamping, and assembly services. |
Our Max. Stamping Machine Tons. | 200 Tons. |
Our Max Injection Machine Tons | 300 Tons |
Our Production Cycles | 21 working days for the new mold and within 7 working days for exiting model(Depends on the QTY) |
Our Certificate | ISO9001: 2015; ISO14001: 2015; IATF16949: 2016 |
Quality Assurance | 100% quality assurance. |
1: Q: Can you introduce your working process and your advantages?